Below are a number of links to the documents for the Public Consultation – please click the link for any document you wish to view.
The full list is in this document: Lechlade St Lawrence Project Inspire document register v4 September 2023
Key Documents
A101 – Petition _reference 2021-064592_Form3FullEngland2020Report_2023_09_05
A102 – 2021-064592_Form2England2020Report_2023_08_28
A103 – letter to DAC Secretary 31 Jul 23
A104 = 03.07.23 Notification of Advice
A105 – DAC Notification of Advice_Comments log_31 Jul 23_v2
A106 – email from Adam Klups28 Apr 23Adam Klups
A107 – Extract+from+the+Minutes+of+the+Lechlade+St+Lawrence+PCC+held+on+23rd+March+2023
Statement of Need
B101 – Lechlade_St Lawrence _Statement of Need_V19
B102 – Annex 1 Worship and Mission in 2022 Supporting document to the Statement of Need
B103 – Annex 2 – Floor design – Response to DAC comments v2
B104 – Annex 3 – the choir screen – Supporting document to the Statement of Need v1
B105 – Annex 4 – Use of the church – Supporting document to the Statement of Need
B106 – Annex 5 – Towards Net Zero carbon – Supporting document to the Statement of Need
Statement of Significance
C101 – Lechlade_St Lawrence_SoS_Part2_V10
C102 – PI3_Lechlade_St Lawrence_ SoS Part 1 _V10
Report and Measured Survey
D101 – PI05_Lechlade-St Lawrence_QI Report_Complete
D102 – 1922-02_Ground Floor Plan_As Existing_Feb20 (A1)
D103 – 1922-03_South and West Elevations_As Existing_Feb20 (A1)
D104 – 1922-04_North and East Elevations_As Existing_Feb20 (A1)
D105 – 1922-05_Sections AA-BB-CC_As Existing_Feb20 (A1)
D106 – 1922-06_Site Plan and Additional Floor Plan_As Existing_Feb20 (A1)
Surveys and Investigations
E101 – Lechlade+St+Lawrence_Project_Inspire_Report+on+Ledgerstones
E102 – Lechlade+St+Lawrence+Ledgerstones+Watching+Brief+Urban+Archaeology
E103 – Lechlade+St+Lawrence+GPR+survey+report
Consultations
F101 – Comments+log-+formal+consultation+-+statutory+consultees_v1_5+Jun+23
F102 – 4184 St Lawrence Church Lechlade Response to Historic England (1)
F103 – 68786+A4+Brochure+v10+(3)
F104 – Presentation to the church commumity 16 February_v2
F105 – Consultation+Meeting+16+02+23+notes (1)
F106 – Summary+of+comments (informl consultation)+from+statutory+consultees+and+DAC+v1
F107 – Comments+log-+statutory+consultees (informal consultation) _V7 (2)
F108 – Lechlade_St+Lawrence+_Report+on+the+2021+public+consultation+V6 (1)
Chedburn Codd conservation architects’ drawings
G101 – 1922_10A_Lechlade St Lawrence_Faculty_Site Plan Proposed_Scale 1to100atA1_1st Sept23
G104 – 1922_13B_Lechlade St Lawrence_Faculty_Section AA Proposed_Scale 1to50atA1_1st Sept23
G105 – 1922_14A_Lechlade St Lawrence_Faculty_Section BB Proposed_Scale 1to50atA1_1st Sept23
G106 – 1922_15_Lechlade St Lawrence_Faculty_Section CC Proposed_Scale 1to50atA1_1st Sept23
G107 – 1922_16A_Lechlade St Lawrence_Faculty_Section DD Proposed_Scale 1to50atA1_1st Sept23
G109 – 1922_18A_Lechlade St Lawrence_Faculty_South Elevation Proposed_Scale 1to50atA1_1st Sept23
G110 – 1922_19_Lechlade St Lawrence_Faculty_East Elevation Proposed_Scale 1to50atA1_1st Sept23
G111 – 1922_20A_Lechlade St Lawrence_Faculty_North Elevation Proposed_Scale 1to50atA1_1st Sept23
G112 – 1922_21A_Lechlade St Lawrence_Faculty_West Elevation Proposed_Scale 1to50atA1_1st Sept23
G113 – 1922_24A_Lechlade St Lawrence_Faculty_Floor Finishes Proposed_Scale 1to75atA2_1st Sept23
G117 – Lechlade+St+Lawrence_Project+Inspire_Feasibility+Study_Feb20_compressed
Chedburn Codd Planning drawings
H101 – 1922_41B_Lechlade St Lawrence __Planning_Site Plan Proposed_Scale 1to100atA1_1st Sept23
H102 – 1922_42A_Lechlade St Lawrence _Planning_Ground Floor Plan Proposed_Scale 1to50atA1_1st Sept23
H103 – 1922_43_Lechlade St Lawrence _Planning_Roof Plan Proposed_Scale 1to50atA1_31stAug23
H104 – 1922_44A_Lechlade St Lawrence _Planning_Vestry Path Proposed_Scale 1to50atA1_31stAug23
H105 – 1922_45B_Lechlade St Lawrence _Planning_Storage Sheds Proposed_Scale 1to50atA1_1stSept23
H106 – 1922_46B_Lechlade St Lawrence _Planning_ASHP Proposed_Scale 1to50atA3_4thSept23
H107 – 1922_48B_Lechlade St Lawrence _Planning_North Porch Doors Proposed_Scale 1to50atA3_1stSept23
H108 – 1922_49A_Lechlade St Lawrence _Planning_South Elevation Proposed_Scale 1to50atA1_1stSept23
H109 – 1922_50_Lechlade St Lawrence _Planning_East Elevation Proposed_Scale 1to50atA1_1stSept23
H110 – 1922_51A_Lechlade St Lawrence _Planning_North Elevation Proposed_Scale 1to50atA1_1stSept23
H111 – 1922_52A_Lechlade St Lawrence _Planning_West Elevation Proposed_Scale 1to50atA1_1stSept23
Electrical and Mechanical Reports and Drawings
J101 – ME4184 Stage 3 Report Rev B
J106 – 4184 E 01 Ground Floor Lighting and Fire Alarm Layout
J107 – 4184 E 02 High Level Lighting and Fire Alarm Layout
J108 – 4184 E 03 Lighting and Fire Alarm Sections
J109 – 4184 E 04-1 Ground Floor Power, Data and AV Layout
J110 – 4184 E 04-2 Gallery Level Power, Data and AV Layout
J111 – 4184 E 07 Security Systems Layout
J112 – Lechlade+St+Lawrence+Project+Inspire+Heating+Options
J113 – Lechlade+St+Lawrence+St+Lawrence+M+&+E+Services+Feasibility+study
Structural Engineer’s Report and Drawings
K101 – 0117 St Lawrence Lechlade Project Inspire Stage 3 Structural Engineering Report rev A
K102 – 0117 St Lawrence Lechlade Project Inspire New Gallery Structure 16 Sept 22 (1)
K103 – 0117 30 Vestry Roof Proposals
K104 – 0117 20 Basement Ceiling Repair Options
Other Documents
L101 – Inventory of monuments etc 25 May 2021
L102 – Schedule of monuments to be relocated
L103 -Lechlade+St+Lawrence+-+notes+from+ringers-Inspire+team+meeting+19+May+23